FREE SHIPPING
L'Original Logo
en

Month 07

Solo exhibition checklist: 49 points to succeed in 2026

8 min readBy Dorian Verdier

In 30 seconds

A successful solo exhibition requires at least 6 months of preparation. 49 points divided into 5 phases: D-180 conception, D-90 logistics, D-30 mobilization, D-7 finalization, D+1 follow-up. 80% of artists neglect phases D-180 and D+1, which ruins results. An exhibition following this checklist converts 30 to 50% of artworks on average in 4 weeks.

Why 49 points are necessary

I have accompanied about thirty solo exhibitions of loriginal artists in 5 years. Those that succeed leave nothing to chance.

Those that flop always neglect 8-15 critical points. The difference between 35% and 5% in sales is not due to the artworks themselves, but to the rigor of execution.

Phase D-180, conception (12 points)

Selection of the 12-25 artworks for the show, validation of dimensions with the venue, contract signature (duration, commission, insurance), definition of theme/title, first draft of press release, reverse calendar, estimated budget, calendar validation vs other events, choice of opening hours (Thursday 5PM-8PM is optimal), identification of 5-10 VIPs, photographer booking, pricing strategy.

Phase D-90, logistical preparation (14 points)

Artwork insurance, specialized transport, hanging plan, label production (see artwork labels), poster, hashtags, 3-5 Instagram teasers, media list, physical invitation card, high-resolution photography of the main artwork, caterer, sales team, pre-printed order forms, payment system.

Phase D-30, mobilization (12 points)

Physical invitations (D-30 to D-21), email (3 sequences D-30, D-14, D-3), press release to media (D-21), media follow-ups (D-14), social media announcement (D-21, D-14, D-7, D-1), Facebook event (D-21), VIP confirmation by call, VIP pre-reservation, final hanging validation, sound and light test, team briefing, caterer confirmation.

Phase D-7, finalization (8 points)

Hanging (D-2 or D-1), label and press kit installation, lighting test for each artwork, buyer opening kit preparation, charging phones and photo equipment, final sales script briefing, sleep and physical preparation, opening speech 3-5 minutes max.

Phase D and D+1 (3 points)

Arrival 90 mins before opening, active selling and collecting interested parties' contact info, D+1 personalized thank yous to the 10-15 serious prospects.

The 5 mistakes that sink an art opening

  • Mistake 1, underestimating preparation time. Organizing in 2 months is suicidal. 6 months minimum.
  • Mistake 2, neglecting personalized VIP invitations. Group email vs phone call: totally different ratios.
  • Mistake 3, forgetting post-opening follow-up. Many sales materialize in the 14 days after, not on the opening night.
  • Mistake 4, mismanaging the sales moment. Nobody in charge of the conversation, no order forms ready.
  • Mistake 5, not documenting visually. Opening night photos are marketing assets for 2-3 years.

FAQ

Minimum time to organize an opening?

12 weeks minimum if you take shortcuts. 6 months is the professional standard.

Should you pay a curator for a solo show?

Not mandatory if you are represented by a gallery. Recommended for artist-run centers or institutions.

How to manage a major unforeseen event (damaged artwork, late caterer)?

Plan B documented in advance, team informed, generous time margins.

What to do next

  1. Submit my application
  2. Discover the course
  3. Download the Checklist

Back to month 07 : How to Plan an Art Exhibition Opening